Central bearing and internal power shaft. KIA Magentis/Optima (since 2000 of release)
Magentis and Optima repair since 2000 of release
1. Engines
2. Greasing system
3. Cooling system
4. Control and decrease in toxicity
5. Fuel system
6. Ignition system
7. Coupling
8. Transmission
9. Power shafts, axes
9.1. Specifications
9.2. Power shaft
9.3. A power shaft with CV JOINTS of ball type and type Birfield
9.4. A power shaft with Birfield (B) CV JOINTS
9.5. Central bearing and internal power shaft
9.6. Rotary fist and nave of a forward wheel
9.7. Back axis
9.8. Search and elimination of malfunctions
10. Suspension bracket
11. Steering
12. Brake system
13. Body
14. Central air
15. Electric equipment
16. Electric circuits
 










9-5-centralnyjj-podshipnik-i-vnutrennijj-privodnojj-val.html

9.5. Central bearing and internal power shaft

Dismantling

 PERFORMANCE ORDER

1. Using the special tool, remove an arm of the central bearing from an internal shaft.

2. Using the special tool, squeeze out the central bearing from outer side of the central bearing as is shown in drawing.

Check

 PERFORMANCE ORDER

1. Check an internal shaft on existence of damages, bends or a rust.
2. Check shlitsa of an internal shaft on existence of wear or damages.
3. Check the central bearing on existence of development, decolouration and a roughness of surfaces of a pin.

Assembly

 PERFORMANCE ORDER

1. Put universal konsistentny greasing on the central bearing and in an arm of the central bearing.

2. Using the special tool, press the central bearing in an arm.

3. Put universal konsistentny greasing on a back surface of all dustproof consolidations.

The recommended lubricant: LIG-2 or Sunlight No.2

  • Internal dustproof consolidation: 7–10 g
  • External dustproof consolidation: 4–6 g

4. Using the special tool, insert external and internal dustproof consolidation so that they were flush with edge of an arm of the central bearing.

When drawing lubricant be convinced that it is put only on a working edge of dustproof consolidation.

5. Using the special tool, establish the central bearing as is shown in drawing, then press it on an internal shaft.


«on a step back
9.4. A power shaft with Birfield (B) CV JOINTS
on the following page»
9.6. Rotary fist and nave of a forward wheel